|
|
|
|
|
|
|
|
|
Charcoal Machine Series
· Hammer Mill
· Activated Carbon Equipment
· Straw Crusher
· Sawdust Carbonization Furnace
· Bullen Carbonization Furnace
· Wood Grinder
· Gasify Continuous Carbonization Furnace
· Automatic Carbonization Furnace
· Double Inlet Wood Sawdust Crusher
· Universal Grinder
· Horizontal Drying and Carbonization All-in-one Machine
· Coconut Shell Carbonization Furnace
Areated block series
· Spreader
· Blender
· Cutting machine
· Casting machine
· Slurry metering system
· Aerated concrete technological process
· Autoclaved aerated concrete equipment
· Template|Side panels|Steam curing machine
Crushing Series
· Heavy Hammer Crusher
· Jaw Crusher
· Roll Crusher
· Impact Crusher
· Impact Crusher · Cone Crusher
· Composite Energy-saving Crusher
· Vertical Composite Crusher
· Hammer Crusher
Grinding Series
· Mill
· Energy-saving Ball Mill
· Ball Tube Mill
· Cement Ball Mill
· Ceramic Ball Mill
· Steel Ball Coal Mill
· Rod Milling Sand-maker
· Wet Pan Mill
Magnetic series
· Permanent Magnet Drum Separator
· Dry Magnetic Separator
· Sand Separator
· Wet Magnetic Separator
· Tailings Recycling Machines
· High Gradient Magnetic Separator
Washing equipment series
· BF Type Flotation
· BS-K Type Flotation
· JJF Series Flotation
· XJM Type Flotation
· High Weir Spiral Classifier
· Spiral Chute
· Shake
· Spiral Washing Machine
Graded series of screening
· High Frequency Sieve
· Circular Vibrating Screen
· Linear Vibrating Screen
Beneficiation Aids Series
· Rotary Drum Dryer
· Indirect Heat Dryer
· Efficient Thickener
Dressing aids series
· Chute Feeder
· Vibrating Feeder
· Bucket Elevator
· Mixing Barrel
· Conveyer Belt
· Pendulum Feeder
· Disc Type Feeder
· Feeder
Series Production Line Configuration Series
· stone production line
Beneficiation Production Line Equipment
 

Gasify Continuous Carbonization Furnace

Working Process of Gasify Continuous Carbonization Furnace:
    After extruded from the rod machine, the carbonization of rod materials can be 3 steps: low temperature damp exhaust--high temperature calcination--cooling. Before carbonization, the rod has water content about 8%, which would be a big problem of carbonization/charring since the moisture will seriously affect the charring quality. So the moisture removal time must be guaranteed, which needs 10-15 hours for kiln and 2-3.5 hours for mechanisms kiln. Long heating time can avoid rod cracking caused by moisture, and guarantee charring quality.

    When the furnace temperature reaches 300℃, there are large amounts of combustible gases generated in the furnace. Generally speaking, 3m3 methane gas can be generated from 0.5kg rod materials, which helps to heat the furnace. Or use the gases as drying heat for dryers. The temperature for calcination is above 400℃ and the furnace must be sealed with anaerobic closing fire. The cooling can be spontaneous cooling or water cooling.
After carbonization, first keep ventilation of the charcoal kiln(carbonization furnace) to prevent carbon dioxide poisoning. The charcoal should be placed outdoors more than 8 hours to complete cooling.

Matters
Need Attention:
    When the first lit of carbonizer or midway flameout, the fire door in the side must be opened, in case of too much combustible gas in the furnace, there may be detonation happen when lighting, cause a harm to the personal safety.
Technical Parameter:

Main motor

Adjustable-speed motor

380V/50HZ

Power 3KW

Draught fan

variable frequency speed

380V/50HZ

Power 3KW

Temperature of carbonized pipeline:500℃─700℃

Temperature within the furnace:350℃─500℃


 
Copyright: Henan Gongyi Fuwei Heavy Industry Machinery Factory
Tel:+86-13592531525  Fax:+86-371-64362222  Contact: Mr.Fu
Website: http://cnfw.en.alibaba.com   E-mail:cnfwzgfrank@hotmail.com  
Mineral Processing Equipment|Sand production line|Ball Mill
《People's Republic of China telecommunications and information services business license》
No.: YuICPBei05014954
博美网赚